— Lighting Design & Retrofit · Market Harborough

The Symington Building

Engineering-led principal contractors

The Challenge

The Symington Building · 13,000 SQ FT · 4 Floors
A heritage and modern mixed-use building, sustainability targets, and three layers of sign-off.

The Symington Building combines heritage front-of- house spaces with standard back-of-house and offices across four floors. Fluorescent failures were rising, energy costs climbing, and the building had sustainability targets to meet. Working hours were restricted: heritage areas were day-only and required careful product selection. Sign-off involved NG Bailey’s regional director, the Council Cabinet, and the board.

The Approach

ASG carried out a full site inventory and Relux design modelling before any product decisions were made. Lux levels were mapped area by area, and sample fittings were approved before manufacturing began. The product strategy split by zone: high-efficiency LED fittings from Lightforms and QVIS in back-of-house and offices; higher-specification fittings in the heritage front-of-house, with Bluetooth controls throughout.

A day team worked through heritage areas; a night team covered the remaining floors, with the controls engineer commissioning each zone as it completed. The bespoke fittings arrived in black rather than the specified white. The client kept some in that finish; ASG delivered the remainder in white within one week, against a six-week standard lead time, on programme and at no additional cost.

Gallery

On Site

The Outcome

51.3
%
Load Reduction
27.77
KW
Saved
3yr
2m
Payback
12
tCO₂e
Carbon Saving
ASG delivered inside a live building, around heritage day-only access and three layers of sign-off. The lighting load came down by more than half. The client now owns a Bluetooth control platform with automated emergency reporting they didn’t have before, and on the modelled saving the installation pays for itself inside three years and two months.

“Despite the challenges the project threw at us, we overcame them collaboratively. The client is really happy with the end result — both with the lighting we specified and the control solution they now own.”

Rich Royal · Regional Director, NG Bailey

Project at a Glance

Client:
NG Bailey
Site:
The Symington Building, Market Harborough
Duration:
3 months
Sector:
Commercial, Heritage & Modern Mixed Use
Value:
£350,000
Load Saved:
51.3% / 27.77 kW
Controls:
Bluetooth, automated emergency reporting
Compliance:
NICEIC, BS 5266

Talk to team

Andrew Cowper - Email Headshot-v5
Andrew Cowper
Head of Lighting
a.cowper@asgsl.co.uk
Andrew leads ASG’s lighting division, from initial Relux design and product specification through to installation and commissioning. His focus is delivering measurable energy outcomes for clients in live commercial environments.
Ella Boothroyd - Email Headshot
Ella Boothroyd
Project Coordinator
e.boothroyd@asgsl.co.uk

Other Case Studies

Share to your favourite platforms