— FULL MEP DESIGN & BUILD · NEW-BUILD JUNIOR SCHOOL

Barton Junior School, Dover

ENGINEERING-LED PRINCIPAL CONTRACTORS

The Challenge

NEW-BUILD JUNIOR SCHOOL · FULL MEP PACKAGE
A new school building where the mechanical, electrical and ventilation design all had to be resolved before a single classroom could open.

Dover District Council commissioned a new junior school, with T&B Contractors appointed as main contractor. ASG was appointed to deliver the full mechanical and electrical package, taking the design from RIBA Stage 3 through to completion. A new school leaves no room for retrofitting mistakes later: the servicing strategy had to be right at design stage, and coordinated with the architect and consultant team before installation began.

The Approach

ASG developed a ventilation strategy that combined natural and mechanical systems, balancing air quality and comfort against running cost. Heating was integrated into the lighting system using radiant panels, an approach that freed up space and improved efficiency across the teaching areas rather than treating each service in isolation.

Taking the design from Stage 3 to completion, ASG managed the full technical development and coordination of the MEP works, using BIM to integrate every discipline in a single coordinated model. Clashes were resolved before they reached site, working alongside the consultant, architect and main contractor teams, and the package was delivered in a 24-week programme.

The Outcome

24
week
programme
£1.26
m
MEP Package
BIM
-coordinated
all disciplines
The school opened with a fully coordinated MEP installation: mechanical and natural ventilation working together, radiant-panel heating integrated into the lighting, and an electrical system designed around how the building would actually be used. Delivered in 24 weeks, ready for teaching.

Project at a Glance

Client:
Dover District Council
Main contractor:
T&B Contractors
Consultant:
Hurley Palmer Flatt
Architect:
ECE Architects
PQS:
MPG
Site:
Barton Junior School, Dover, Kent
Sector:
Education
Value:
£1,260,000 (MEP Package)
Duration:
24 Weeks
Scope:
Full MEP design and build, RIBA Stage 3 to completion
Systems;
Natural and mechanical ventilation; radiant-panel heating integrated with lighting; full electrical
Delivery:
BIM-coordinated design across all disciplines

Talk to team

About us

ASG is an engineering-led principal contractor working across mechanical and electrical, lighting and energy, service and maintenance, and soft strip out, for commercial, industrial and public sector clients. We manage every stage in-house, from design and supply through to installation and long-term maintenance. Safety, compliance and long-term performance run through all of it.