National Grid Warwick – CRAC Unit Replacement in Data Centre – Critical Environment

To undertake a detailed design, supply and install, test and commission a complete CRAC unit replacement with all associated mechanical and electrical services, including the production of all necessary drawings and documentation, as well as on-site reconnections and re-tests.

The challenge on this project was working in a live critical environment. The engineers executed this perfectly, understanding the needs of the client and ensuring each unit was taken offline individually to allow the cooling of the space to continue while we worked.

ASG developed the design and worked with Airedale to ensure the new systems met the requirements of an otherwise old system.

The client was thoroughly impressed with the quality of the install and the discreet, delicate manner in which it was delivered, with all dust and debris contained to ensure the integrity of the working environment.